Infolink ADs

Tuesday, August 23, 2016

Indian 1000 Rupee note with tanjore temple (now known as brihadeeswarar temple) at thanjavur in tamilnadu .

First issued in 1954; demonetized on 16th January 1978 . It had an image of tanjore temple (now known as brihadeeswarar temple) at thanjavur in tamilnadu  .Brihadeshwara Temple (locally known as Tanjai Periya Kovil) is a Hindu temple dedicated to Shiva located in Thanjavur in the Indian state of Tamil Nadu. It is also known as RajaRajeswara Temple Rajarajeswaram and Brihadeshwara Temple.Built by Raja Raja Chola I and completed in 1010 CE, the temple turned 1000 years old in 2010. The vimanam (temple tower) is 100 ft (30 m) high and is the tallest in the world. The Kumbam (the apex or the bulbous structure on the top) weighs around 80 tons.[5] There is a big statue of Nandi (sacred bull), carved out of a single rock measuring about 16 ft (4.9 m) long and 13 ft (4.0 m) high at the entrance.The temple is part of the UNESCO World Heritage Site known as the "Great Living Chola Temples", with the other two being the Brihadeeswarar Temple, Gangaikonda Cholapuram and Airavatesvara temple.

The Hirakud dam on the Rs 100




A hundred rupee note was issued on 26 December 1960 by RBI Governor H.V.R. Iyengar. The size of this note is 109x172 mm. On the back side of this note there are thirteen regional languages along with an image of the Hirakud Dam and Hydro-Electric station.

Hirakud dam was the first post independence river valley project in India.Before the devastating floods of 1936, Sir M. Visveswararya proposed a detailed investigation for storage reservoirs in the Mahanadi basin to tackle the problem of floods in the Mahanadi delta. In 1945, under the chairmanship of Dr. B. R. Ambedkar, the Member of Labour, it was decided to invest in the potential benefits of controlling the Mahanadi for multi-purpose use. The Central Waterways, Irrigation and Navigation Commission took up the work. On 15 Mar 1946, Sir Hawthrone Lewis, the Governor of Odisha, laid the foundation stone of the Hirakud Dam. A project report was submitted to the government in June 1947. Pandit Jawaharlal Nehru laid the first batch of concrete on 12 April 1948. The dam was completed in 1953 and was formally inaugurated by Prime Minister Jawaharlal Nehru on 13 January 1957. The total cost of the project was Rs.1000.2 millions in 1957. Power generation along with agricultural irrigation started in 1956, achieving full potential in 1966. Situated at a distance of 15 km to the north of Sambalpur, it holds the distinction of being the longest dam of the world. It is a complex structure built across the river Mahanadi and was formed for the purpose of irrigation and flood control. Hirakund dam is about 4.8 km long, bordered by earthen dykes on its left as well as right. Along with the dykes, the length of the dam increases to 25.8 km. the storage capacity of Hirakud Dam is 5818 m.

Stretching over an area of 743 sq. km, the reservoir serves as one of the biggest artificial lakes in Asia. The 21 km long stretch along the dyke provides the perfect locale for going on a long drive. Enjoy the scenery of the mighty Hirakud dam and rest assured that you will be fascinated with the larger-than-life image that the Hirakund dam offers. A revolving minaret at the top of the dam, known as the Gandhi Minar provides a lovely scene with its vast expanse of water.

The Hirakud dam was constructed to regulate the even flow of the Mahanadi River in Orissa. Before the dam was built, the area used to have droughts in the lower basin and violent floods in the upper plain regions. With the construction of this dam, this problem was put to an end as it was possible to regulate the flow of water in the desired area. Along with this, the dam also produces hydro electricity, thus making judicious use of natural resources as well as technology.

Rupees 20 note with the representation of the Wheel of Sun Temple, Konark on the reverse side